Shear Reinforcement Method "RMA Method"
Construction technology certification acquisition method! No need for mortar mixing or installation of injection holes on site!
The "RMA Method" is a shear reinforcement method that allows for reinforcement without encroaching on the inner cross-section of continuous walls. It employs capsules containing premixed mortar as a bonding agent. This method enables construction using impact on long or thick reinforcement bars, making it a post-construction technique. Since there is no need for mortar mixing or the installation of injection holes on-site, special management is unnecessary. Reinforcement is carried out only for the insufficient shear strength, allowing for a transition from shear failure to bending failure. 【Features】 ■ Drilling can be done with a small diameter and only once ■ No mixing on-site, maintaining consistent quality ■ Simple product composition and construction method, reducing construction time ■ Minimal interference with existing structural reinforcement, allowing for reduced re-drilling ■ A method that does not use large or specialized machinery, saving space *For more details, please refer to the PDF document or feel free to contact us.
- Company:ケー・エフ・シー
- Price:Other